The feed-water control valve is the throat of the boiler feed circuit. A forum emergency-planning thread (17 replies) plus practitioners' additions give a very clear picture of handling the high-risk scenario of an accidentally or automatically closed feed-water valve.
350MW; two 50% turbine-driven feed pumps plus one 30% motor-driven standby pump; the feed-water control valve sits downstream of the high-pressure heaters, maintaining the differential pressure for superheater spray water. Scenario: at full load with the valve in manual, operator error or a positioner fault closes the valve wrongly or automatically.
1. Switch both turbine and boiler master stations to manual immediately, trip one coal mill, run the remaining two at minimum, and close the turbine control valves somewhat to cut evaporation
2. If the valve is fully or nearly closed: try to reopen it manually at once — do not yank it wide open against the huge differential (risk of water hammer); trip the second mill, start oil guns to stabilize combustion, and pull the load down fast
3. Start the motor-driven pump promptly per the turbine-pump situation — even if it merely rides along
The two sources of wrong closure — human error and positioner fault — point to the same defenses: strict operating tickets for local/remote switching; catching positioner degradation early through command-vs-feedback deviation trends (see our article on acceptable deviation); and turning the emergency plan into concrete numbers — loadable MW, mill-trip timing, pump-start timing — rather than leaving it on paper.